CONRAD SILVER PROJECT

Future Work

Most of the drilling completed to date within the Conrad Lode is widely spaced (commonly holes are 100m apart along strike and down dip), so much of the resource delineated within this lode is currently in the Inferred category under the JORC Code. Furthermore, some high grade intersections have not been included in estimates of the higher grade resources due to insufficient drilling density. Future drilling will therefore be aimed at upgrading the inferred resource by infill drilling and adding to the inventory of higher grade material by surrounding currently isolated high grade intersections with closer spaced drilling. The lode confluence to the southeast, that appears to replicate the King Conrad/Conrad split, will also be a high priority target.

 
 
ABN 86 075 613 268
COPYRIGHT © 2010 MALACHITE RESOURCES LIMITED